Yesterday I took my first month's substitute check and bought ten 2"x6"x8' pressure treated boards, the same number of 2x6x10 footers, 16 2' x 8' polycarbonate panels and stored them in the CONEX. Next week (inshallah) I'll get about 12 60-pound bags of sakrete and start on the footers. As long as I can get afternoon temperatures above 45° F, I won't have to worry about the concrete curing (I hope).
I've never done work with the polycarbonate panels or digging and pouring a footing. This ought to be ... interesting.