After 2 days of procrastination its back to the electric grind (is that a dance?). I need to do laundry, can’t until I finish rewiring the laundry room. Actually have to rewire two rooms, all the lighting and several of the outlets. So far today I’ve only managed to intake some caffeine, need more it seems.
Last week I needed to patch a small hole in the stairway landing surface. It turned into rebuilding the landing from the floor up. Then I needed to rewire the lighting circuit for the stairway. It’s turned into completely rewiring two rooms and the stairway. I need to stop finding small needed repairs.