Laid 6" Storm pipe and tied in the 4" pipe from a front gutter down spout. 8 tons of shredded top soil delvered Friday afternoon. This evening finished back filling. Monday I'll level a bit, seed with grass and water. Then build the foot bridge.
View attachment 23470 View attachment 23471
Yesterday backfilling touch up, final contours, raked in the grass seed and watered. Today, design, cut, assemble and put in place the foot bridge. Project is done as far as I'm concerned.